IFTLE 110 Samsung Breaks Wall of Silence at DAC 2012

By Garrou

Design Automation Conference  2012

At the design automation conference in June Samsung, who has been on absolute lockdown when it comes to 3DIC materials leaking out of the company, opened the door...just a little bit with Samsung foundry indicating that they will be  ready to release 3D TSV Technology and Wide IO Memory Solutions "in early 2013."

Samsung's message as to the major attributes of 3DIC vs a package on package solution (PoP) are summarized in the slide below:

(Click on any of the images below to enlarge them.)

In terms of wide IO memory solutions they report that they will have wide IO DRAM (Non-JEDEC type ball interface) ready for customer sample in early 2013 and will also have JEDEC standard wide IO DRAM2 .

 They claim that TSV PDK and Design Methodology has been proven for  32nm node:

Not a lot of info, but at least an official indication that Samsung foundry is getting ready and we should be seeing products in les than a year.

Larger Silicon Interposers are Coming

Up to now, silicon interposers have been limited in x,y dimension to the field size of the steppers being used or 35 mm sq. It is no coincidence that the size of the Xilinx FPGA interposer is 35 mm.

At the recent Semicon West, USHIO (link) introduced a large-field stepper lithography tool targeting interposer fabrication for 2.5D/3D semiconductor packaging applications.

Using a 70 mm projection lens the new litho tool is capable of a  50 x 50 mm field size. They are also indicating that by 2013 they will be introducing  100 mm projection lens, which will increase the field size to 70 x 70mm.  Overlay accuracy is reportedly less than 500nm. Alignment is IR transmission based.

 EVG Wafer Bonding System first to Pass Equipment Maturity Assessment at Sematech
EVG announced that its GEMINI Automated Wafer Bonding System has become the first product to pass a systematic, rigorous Equipment Maturity Assessment (EMA) implemented within SEMATECH's 3D Interconnect program. The Sematech assessments are designed to determine equipment readiness for high-volume manufacturing (HVM).

The  EVG GEMINI exceeded Level 3 equipment maturity requirements -- the highest assessment rating awarded before transfer of new manufacturing processes into pilot lines or HVM.  Temporary adhesive bonding, silicon fusion bonding, and metal thermocompression bonding processes have been investigated on 300-mm wafer bonding system installed at CNSE in Albany, New York.

SEMATECH qualified wafer bonding alignment accuracy of less than 500 nm exceeding the wafer alignment specs of the ITRS for 2018.  Sitaram Arkalgud, director of SEMATECH’s 3D Interconnect program indicated that EVG is the first company to pass ISMI's Equipment Maturity Assessment methodology.

 For all the latest in 3DIC and advanced packaging stay linked to IFTLE......................
PhilG100x100

Dr. Phil Garrou gives his insight into leading edge developments in 3-D integration and advanced packaging, reporting the latest technical goings on from conferences, conversations, and more.

Previous Posts

IFTLE 147 IME Updates 2.5D; Qualcomm Updates 2.5 / 3DIC at ICEP

Mon May 13 10:16:00 CDT 2013

IFTLE 146 TSMC Apple Rumors; Gartner OSAT Mkt Numbers; Novati

Sat May 04 12:01:00 CDT 2013

IFTLE 145 GPU Roadmap, IEEE 3DIC back in SF; ConFab 2013 Pkging

Sun Apr 28 15:23:00 CDT 2013

IFTLE 144 Personnel Changes in Taiwan; Glass Usage in WLP

Sun Apr 21 10:29:00 CDT 2013

IFTLE 143 HMC status; Pkging Materials $$ now Exceed Wafer Fab Materials

Sat Apr 13 17:15:00 CDT 2013

IFTLE 142 GlobalFoundries 2.5 / 3D at 20nm; Intel Haswell GT3; UMC / SCP Prototype Details

Tue Apr 09 16:59:00 CDT 2013

IFTLE 141 100GB Wide IO memory; AGC Glass Interposers; Nvidia talks stacked memory

Sun Mar 31 12:17:00 CDT 2013

IFTLE 140 Important Apple Rumors; Xilinx not Deserting 2.5D; Book to Bill Improving

Sun Mar 24 15:20:00 CDT 2013

IFTLE 139 More on Apple A7 processor Production Rumors ; DARPAs ICECool part 2 – Applications

Sun Mar 17 11:54:00 CDT 2013

IFTLE 138 Foundry Intel; 300 mm Capacity; SBA Low-K Oxide

Fri Mar 08 09:21:00 CST 2013

IFTLE 137 CMOS Image Sensor Market Update

Sat Mar 02 17:21:00 CST 2013

IFTLE 136 European 3D SEMI Summit part 3

Sun Feb 17 12:20:00 CST 2013

IFTLE 135 UMC / SCP Memory on Logic; SEMI Europe 3D Summit part 2

Tue Feb 12 13:18:00 CST 2013

IFTLE 134 SEMI 3D European Summit – Is the Wide IO Driver Dead ?

Sun Feb 03 11:51:00 CST 2013

IFTLE 133 SEMI ISS 2013 Comments from Samsung, GF, Intel and others

Mon Jan 28 09:31:00 CST 2013

© 2013. PennWell Corporation. All Rights Reserved. PRIVACY POLICY | TERMS AND CONDITIONS